>
|
|
|
|
Validation and Compliance Consulting Services |
|
|
|
|
Planning |
 |
Master Validation Plan (MVP) |
 |
Risk Assessment |
|
Requirements |
 |
User Requirements
Specification (URS) |
|
Design |
 |
Software Design
Specification (SDS) |
 |
Hardware Design
Specification (HDS) |
|
Configuration |
 |
Hardware Configuration
Specification (HCS) |
 |
Application Configuration
Specification (ACS) |
|
Specifications |
 |
Functional Specifications
(FS) |
 |
Standard Operating
Procedures (SOPs) |
|
Testing |
 |
Installation Qualification
(IQ) |
 |
Operational Qualification (OQ) |
 |
Performance Qualification
(PQ) |
|
Reporting |
 |
Summary Reports |
|
21 CFR Part 11 Services |
 |
Strategy and Planning |
 |
System Inventory |
 |
Gap Analysis |
 |
Remediation |
 |
Technical Controls |
 |
Procedural Controls |
|
|
|
|
|
|
© Copyright
2000-2008. CIMCON Software, Inc. All rights reserved. |
|
|